Shrewsbury Design Code logo

Milestones

  • Public engagement - Phase 1

    21 November 2022

     

    -

     

    14 January 2023

    First consultation period to gather thoughts, ideas and aspirations to inform the preparation of the design code for the pilot area in Shrewsbury.
  • Drafting design code

    1 February 2023

     

    -

     

    28 February 2023

    LDA Design (our consultants) will be creating the codes from the information gathered during the public engagement.
  • Public engagement - Phase 2

    13 March 2023

     

    -

     

    24 April 2023

    Statutory consultation period to ensure the design codes are a material consideration as part of the planning process. This means the design codes can then go on to be formally approved and can be subsequently enforced.